Stadion Dinama

Capacity 40 000
Country Belarus
City Minsk
Clubs FK Dinamo Mińsk
Category Design outdated
Cost 120 mln €
Construction 2013-2014
Design GMP Architekten
Design time 2013

Advertisement

Stadion Dinama – design description

Winning entry of the international competition for conceptual design of Belarusian national stadium redevelopment.

Inside the existing elliptic arcades stands are to be built from scratch, dropping the running track and switching Stadion Dinama to football-specific mode. One tier would encircle the pitch symmetrically, while the upper one would have different height depending on location – lower alongside the pitch (reaching only the level of the colonnade) and much taller behind goals.

Wavy roof and façades are to become a light extension of the colonnade. At the same time the superstructure can be covered with LED lighting to allow dynamic illumination.

Advertisement

Renderings

Related news

2018

2014

2013