Türk Telekom Arena (Seyrantepe Stadi / Aslantepe / New Ali Sami Yen)

Updated: 28.12.2010

Capacity 52 695
Country Turkey
City Istanbul
Clubs Galatasaray Sports Club
Category Construction completed
Inauguration 15.01.2011 (Galatasaray - Ajax Amsterdam)
Cost 120mln €
Construction 13.12.2007 - 01.2011
Design 'asp' Architekten Stuttgart, Obermeyer Planen+Beraten (Monachium), Schlaich – Bergermann and Partner (Stuttgart), Yüksel Proje (Ankara), Amsterdam ArenA Advisory.
Design time 2007
Contractor Varyap, Uzunlar
Withitn the project retractable roof, 4500 vehicule underground car park, 150-180 VIP boxes.

Advertisement

Türk Telekom Arena – construction description

The construction had been halted between July and November 2009 after contract cancelation with Eren Talu.

Advertisement

Pictures

26.12.2010

09.12.2010

15.11.2010

15.10.2010

14.09.2010

07.08.2010

12.07.2010

11.06.2010

13.05.2010

13.04.2010

  • seyrantepe_stadi
    13.04.2010 ©
  • seyrantepe_stadi
    13.04.2010 ©
  •  
  • seyrantepe_stadi
    13.04.2010 ©
  • seyrantepe_stadi
    13.04.2010 ©
  •  

10.03.2010

07.02.2010

07.01.2010

    Error, picture can't be loaded.

    Error, picture can't be loaded.

     
  • seyrantepe_stadi
    07.01.2010 © TTArena.biz
  • seyrantepe_stadi
    07.01.2010 © TTArena.biz
  •  

08.12.2009

02.07.2008

27.01.2008

14.01.2008

Related news

2013