Türk Telekom Arena (Seyrantepe Stadi / Aslantepe / New Ali Sami Yen)
Updated: 28.12.2010
Capacity | 52 695 |
---|---|
Country | Turkey |
City | Istanbul |
Clubs | Galatasaray Sports Club |
Category | Construction completed |
Inauguration | 15.01.2011 (Galatasaray - Ajax Amsterdam) |
Cost | 120mln € |
Construction | 13.12.2007 - 01.2011 |
Design | 'asp' Architekten Stuttgart, Obermeyer Planen+Beraten (Monachium), Schlaich – Bergermann and Partner (Stuttgart), Yüksel Proje (Ankara), Amsterdam ArenA Advisory. |
Design time | 2007 |
Contractor | Varyap, Uzunlar |
Withitn the project | retractable roof, 4500 vehicule underground car park, 150-180 VIP boxes. |
Advertisement
Türk Telekom Arena – construction description
The construction had been halted between July and November 2009 after contract cancelation with Eren Talu.
Advertisement
Pictures
26.12.2010
09.12.2010
15.11.2010
15.10.2010
14.09.2010
07.08.2010
12.07.2010
11.06.2010
13.05.2010
13.04.2010
10.03.2010
07.02.2010
07.01.2010
Error, picture can't be loaded.
Error, picture can't be loaded.