Grand Stade de Tanger

Updated: 24.08.2024

Target capacity 75 600
Capacity before works 45 000
Country Morocco
City Tangier
Clubs Ittihad Riadhi de Tanger
Category Construction in progress
Construction 2020–2025

Advertisement

Grand Stade de Tanger – construction description

The redevelopment of Grand Stade de Tanger began at the end of 2020. Initially, the intention was only to expand the stands on the curves and to create an attractive façade. During the construction process, the plans expanded and it was also decided to remove the athletics track, expand the lower part of the stands and change the character of the stadium to a football-specific one. A new roof over the stands is also to be built.

As the new plans have emerged, the modernization actually has two phases. The first phase saw the expansion of the stands in the curves, which were ready in early 2023, with the stadium hosting matches in the Club World Cup in February 2023. In the summer of 2023, meanwhile, the removal of the athletics track and the expansion of the stands in the lower section began. This work is expected to last until 2025.

The expanded stadium in Tangier will be one of the venues for the 2025 Africa Cup of Nations and the 2030 World Cup.

For more details on the reconstruction of Grand Stade de Tanger, see the project presentation on our website

Advertisement

Pictures

    

24.08.2024

03.08.2024

22.07.2024

01.07.2024

10.06.2024

28.05.2024

11.05.2024

12.04.2024

22.03.2024

09.01.2024

31.12.2023

02.11.2023

18.10.2023

07.10.2023

26.09.2023

17.08.2023

02.06.2023

29.04.2023

11.04.2023

24.03.2023

07.03.2023

25.02.2023

11.02.2023

01.02.2023

21.01.2023

12.01.2023

25.12.2022

15.07.2022

31.05.2022