Stade de Nice

Tournament capacity35 624
CountryFrance
CityNice
ClubsOGC Nice
Inauguration 22/09/2013 (OGC Nice - FC Valenciennes, 4-0)
Construction 08/2011 - 08/2013
Cost € 245 million
Design Wilmotte & Associés, IOSIS
Contractor Vinci
Address Bd des jardiniers, 06200 Nice

Advertisement

Stade de Nice – tournament stadium description

Euro 2016 games:

GameAttendanceTime (local)Stage
  Poland 1–0 Northern Ireland   33,742 12/06/2016 18:00 Group C
  Spain 3–0 Turkey   33,409 17/06/2016 21:00 Group D
  Sweden 0–1 Belgium   34,011 22/06/2016 21:00 Group E
  England 1-2 Iceland   33,901 27/06/2016 21:00 Round of 16

Average attendance: 33,766

 

Before the tournament

OGC Nice had been playing at the aging Stade du Ray for years when the first proposal for new stadium surfaced in 2002. Despite several attempts and numerous promises, efforts to build the venue proved futile until France won the rights to host Euro 2016. In 2009 a design competition was launched, resulting in the new stadium finally getting built.

Euro 2016 investment

Since it’s a brand new stadium catalysed by the event, we include all of its cost into the tournament preparations. Initially estimated at €200 million, the building ended with a €245 million price tag, as established when the construction deal was reached. This means it’s the most expensive stadium of Euro 2016 when compared to capacity and/or population of the city.

Public contributions came from three sides. The state submitted €18 million, the region followed with €20 million, while the remainder rested on the city of Nice. Municipal authorities reached an agreement with the Vinci group, along which the private developer built and will operate the stadium for 26 years, receiving over €8 million per annum from the city.

Interestingly, additional cost surfaced in 2015, when decision was made to replace all 35,000+ seats due to their low durability.

Location

While the old Stade du Ray stands in the historical part of Nice, the site for new one was selected in far less occupied area 12km west of the centre. In the picturesque valley of river Var the stadium lies beside a major highway hub and within close proximity to the international airport.

Architecture

Designed by the famous Jean-Michel Wilmotte, the stadium was part of Nice’s pro-ecologic efforts and this is clearly seen in the design. Simple, neutral in colour and focused on using natural resources in a sustainable manner. For the first time among stadia of this size, the roof is partly based on a wooden skeleton encompassing both the stands and roof. The structure can be clearly seen through the translucent ETFE façade, shaped in an almost fluent, vivid outer form. The roof is covered partly by photovoltaic panels, spanning across 7,000 square meters and producing enough electricity to power 600 households every year.

Euro 2016 stadium planStands

The stadium was built with a fixed capacity of 36,178 seats, reduced to some 35,000 for Euro 2016. Though the capacity doesn’t require it, the seating bowl was divided into three tiers. This on one hand allowed the creation of extensive premium zones across the stadium, on the other made the stadium more compact. And finally it also means it’s easier to reduce capacity when the uppermost tier is not needed.

Legacy use

Long-term operation of the stadium is secured thanks to OGC Nice’s tenancy. In their first season at the stadium, the club enjoyed an impressive average attendance of 24,186 people, though the crowds have decreased before Euro 2016 (19,192 per game in 2015/16).

The stadium is among the best throughout France’s southern coast, a huge tourist hub. That’s why it was also planned as a concert site for up to 45,000 people, especially in the summer season. It also meets all requirements of professional rugby. Additionally, the stadium hosts the museum of French sport and has a retail precinct adjoining it on the east side, providing visitors every day.

Advertisement

Tournament pictures

Non-tournament pictures

Related news

2016

2015